Transcribed Image Text: Required information
[The following information applies to the questions displayed below.]
Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. The company has
two manufacturing departments-Molding and Fabrication. It started, completed, and sold only two jobs during March-
Job P and Job Q. The following additional information is available for the company as a whole and for Jobs P and Q (all
data and questions relate to the month of March):
Molding
2,600
$ 10,400
$ 1.40
Fabrication
Total
1,560
$ 15,600
$ 2.20
Estimated total machine-hours used
4,160
$ 26,000
Estimated total fixed manufacturing overhead
Estimated variable manufacturing overhead per machine-hour
Job Q
$ 8,320
$ 7,800
Job P
$ 13,520
$ 21,840
Direct materials
Direct labor cost
Actual machine-hours used:
Molding
Fabrication
1,780
830
930
620
Total
2,400
1,760
Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month.
Required:
For questions 1 to 9, assume that Sweeten Company uses departmental predetermined overhead rates with machine-
hours as the allocation base in both departments and Job P included 20 units and Job Q included 30 units. For questions
10 to 15, assume that the company uses a plantwide predetermined overhead rate with machine-hours as the allocation
base.
15. What was Sweeten Company’s cost of goods sold for March? (Do not round intermediate calculations.)
Cost of goods sold Transcribed Image Text: Required information
[The following information applies to the questions displayed below.]
Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. The company has
two manufacturing departments-Molding and Fabrication. It started, completed, and sold only two jobs during March-
Job P and Job Q. The following additional information is available for the company as a whole and for Jobs P and Q (all
data and questions relate to the month of March):
Molding
2,600
$ 10,400
$ 1.40
Fabrication
Total
Estimated total machine-hours used
Estimated total fixed manufacturing overhead
Estimated variable manufacturing overhead per machine-hour
1,560
$ 15,600
$ 2.20
4,160
$ 26,000
Job P
$ 13,520
$ 21,840
Job Q
$ 8,320
$ 7,800
Direct materials
Direct labor cost
Actual machine-hours used:
Molding
Fabrication
1,780
830
620
930
Total
2,400
1,760
Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month.
Required:
For questions 1 to 9, assume that Sweeten Company uses departmental predetermined overhead rates with machine-
hours as the allocation base in both departments and Job P included 20 units and Job Q included 30 units. For questions
10 to 15, assume that the company uses a plantwide predetermined overhead rate with machine-hours as the allocation
base.
12. If Job P included 20 units, what was its unit product cost? (Do not round intermediate calculations. Round your final answer to
nearest whole dollar.)
Unit product cost