The following processes are being scheduled using a preemptive, roundrobin scheduling algorithm. Each process is assigned a numerical priority, with a higher number indicating a higher relative priority. In addition to the processes listed below, the system also has an idle task (which consumes no CPU resources and is identified as Pidle). This task has priority 0 and is scheduled whenever the system has no other available processes to run. The length of a time quantum is 10 units. If a process is preempted by a higher-priority process, the preempted process is placed at the end of the queue. Transcribed Image Text: task (which consumes no CPU resources and is identified as Pidle). This
task has priority 0 and is scheduled whenever the system has no other
available processes to run. The length of a time quantum is 10 units.
If a process is preempted by a higher-priority process, the preempted
process is placed at the end of the queue.
Thread Priority | Burst
P
P2
P3
P4
Arrival
40
20
30
25
25
30
25
30
15
10
35
60
P5
100
10
10
105
a. Show the scheduling order of the processes using a Gantt chart.
b. What is the turnaround time for each process?
c. What is the waiting time for each process?
d. What is the CPU utilization rate? Transcribed Image Text: 6.17 The following processes are being scheduled using a preemptive, round-
robin scheduling algorithm. Each process is assigned a numerical
priority, with a higher number indicating a higher relative priority.
În addition to the processes listed below, the system also has an idle